ELLIS, GREG

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 279 CAT TRACK LOADER
5/5/2026 SAVAGE,BRIAN 1 HRS MOVED 742353
279 CAT TRACK LOADER TOTAL 1
750 KIOTI SKIDSTEER
5/5/2026 EISWORTH,GEORGE 3 HRS 742156
750 KIOTI SKIDSTEER TOTAL 3
80 EXCAVATOR
5/5/2026 SAVAGE,BRIAN 1.5 HRS MOVED 742352
5/28/2026 EISWORTH,GEORGE 11 HRS 743499
80 EXCAVATOR TOTAL 12.5
ONE TON
5/28/2026 MCALLISTER,JAMES 11.5 HRS 743422
ONE TON TOTAL 11.5
EQUIPMENT TOTAL 28
LABOR CEMENT
5/6/2026 LYONS,GEORGE 1 HRS 742331
5/7/2026 OVERLOCK,MIKE 9 HRS 742325
5/7/2026 LYONS,GEORGE 9 HRS 742332
CEMENT TOTAL 19
REGULAR
5/5/2026 EISWORTH,GEORGE 6 HRS 742157
5/6/2026 CARTER,CAMERON 4 HRS WENT AND GOT SKIDSTEER 742155
5/28/2026 MCALLISTER,JAMES 11.5 HRS 743423
REGULAR TOTAL 21.5
LABOR TOTAL 40.5
MATERIALS CALCIUM
5/7/2026 LYONS,GEORGE 2 BAGS 742333
CALCIUM TOTAL 2
CONCRETE, 3000 PSI
5/7/2026 LYONS,GEORGE 10.5 YDS $1,858.92 742334
CONCRETE, 3000 PSI TOTAL 10.5
CULVERT, 15"
5/28/2026 MCALLISTER,JAMES 60 FT 743424
CULVERT, 15" TOTAL 60
MATERIALS TOTAL 72.5
TRUCK MATERIALS STONE, 3/4"
5/5/2026 ROUND 2,TRUCKING 36 YDS BASS HARBOR STOCKPILE 742178
5/28/2026 COUSINS,BOB 18 YDS BASS HARBOR STOCKPILE 743718
STONE, 3/4" TOTAL 54
TRUCK MATERIALS TOTAL 54
OVERALL TOTAL 195

16 Records