WOOD-HILLCREST

Back to JOBS IN PROGRESS
Exit Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 160 EXCAVATOR
745696
160 EXCAVATOR TOTAL 1
200 EXCAVATOR
736161
736564
736749
736870
200 EXCAVATOR TOTAL 20
75 EXCAVATOR
737292
737229
737290
740226
740351
741015
741056
744977
744879
744881
744890
745359
745363
745368
745371
745372
746000
75 EXCAVATOR TOTAL 82.5
8 YD TRUCK
745632
8 YD TRUCK TOTAL 3
80 EXCAVATOR
742487
742489
80 EXCAVATOR TOTAL 4
BOOMTRUCK
736991
737840
BOOMTRUCK TOTAL 4
DOZER, 450
736163
736750
736754
740350
741016
741344
DOZER, 450 TOTAL 11.5
DOZER, 550
737040
737291
DOZER, 550 TOTAL 8.5
ONE TON
744762
745394
ONE TON TOTAL 4
PULPTRUCK
737512
737448
746103
PULPTRUCK TOTAL 13.5
ROLLER
741396
ROLLER TOTAL 1.5
SKIDDER
735446
SKIDDER TOTAL 1.5
TRIAXLE
744964
745087
745593
TRIAXLE TOTAL 7
WHEELER
745496
745741
WHEELER TOTAL 3
EQUIPMENT TOTAL 165
LABOR CEMENT
736593
736724
736733
736726
736734
736596
736727
736737
736978
736982
736979
736985
736980
736987
736981
736989
737247
737258
737268
737249
737263
737520
737525
737541
742769
742774
745149
CEMENT TOTAL 169.5
REGULAR
736751
736755
736847
736871
737041
737387
737301
740225
741007
741017
740979
744757
744880
744882
745138
744763
745254
745360
745365
745603
745255
745369
745257
745258
745373
745899
745970
746001
745896
REGULAR TOTAL 123.5
LABOR TOTAL 293
MATERIALS BIGFOOT
742775
BIGFOOT TOTAL 5
BOLTS
737259
BOLTS TOTAL 48
CALCIUM
736735
736983
736986
737260
737526
CALCIUM TOTAL 17
CONCRETE, 3000 PSI
736984
737261
737527
742777
CONCRETE, 3000 PSI TOTAL 61.5
CULVERT, 15"
740227
CULVERT, 15" TOTAL 20
DISTRIBUTION BOX 8 OUTLET
744883
DISTRIBUTION BOX 8 OUTLET TOTAL 1
DRAIN, FLOOR
737529
DRAIN, FLOOR TOTAL 1
ELJEN INDRAINS
740413
ELJEN INDRAINS TOTAL 24
FOAM, EXPANDING
745604
FOAM, EXPANDING TOTAL 1
GSF UNITS
744884
GSF UNITS TOTAL 24
HAY
746002
HAY TOTAL 6
MISCELLANEOUS
736990
MISCELLANEOUS TOTAL 0
PIPE, 2" BLACK PLASTIC
745361
PIPE, 2" BLACK PLASTIC TOTAL 110
PIPE, SCH 20-4" PERF
736753
744885
744891
PIPE, SCH 20-4" PERF TOTAL 200
PIPE, SCH 35 4" PERFORATED
736851
PIPE, SCH 35 4" PERFORATED TOTAL 370
PIPE, SCH 35-4"
736752
744886
PIPE, SCH 35-4" TOTAL 82
PIPE, SCH 40-4"
745367
PIPE, SCH 40-4" TOTAL 10
POLY
737528
POLY TOTAL 0
REBAR, #4
736736
736988
742778
REBAR, #4 TOTAL 68
SCH 35 90, 4"
736848
744887
SCH 35 90, 4" TOTAL 16
SCH 35, 22 1/2 4"
736850
SCH 35, 22 1/2 4" TOTAL 1
SEED
746003
SEED TOTAL 4
SONOTUBE, 10"
742776
SONOTUBE, 10" TOTAL 16
STYROFOAM, 2"
745362
745364
745374
STYROFOAM, 2" TOTAL 5
TANK, 1000 GALLON LIFT STATION
745366
TANK, 1000 GALLON LIFT STATION TOTAL 1
TAR
737264
TAR TOTAL 3
TEE, SCHEDULE 35-4"
736849
744888
TEE, SCHEDULE 35-4" TOTAL 5
MATERIALS TOTAL 1099.5
OTHER FEES DISPOSAL FEES
737513
737449
745088
745592
746104
DISPOSAL FEES TOTAL 0
SUBCONTRACT
728723
SUBCONTRACT TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL
737499
736379
736400
736494
736386
736406
736500
736664
736674
736682
736692
736685
736686
736696
736697
736716
737592
737179
737193
737208
737233
737460
737482
737770
737792
740311
742830
742831
744961
745084
745495
745589
745590
745490
745491
GRAVEL TOTAL 1058
GRAVEL, 2" MINUS
736711
736713
GRAVEL, 2" MINUS TOTAL 90
LEDGE, 3"
741486
744962
LEDGE, 3" TOTAL 66
LEDGE, 5"
736683
LEDGE, 5" TOTAL 16
LOAM, SCREEN
737946
745705
745837
746102
LOAM, SCREEN TOTAL 58
SAND
737950
737956
SAND TOTAL 154
SAND, SCREENED
744963
744812
745086
745393
745605
745591
745489
SAND, SCREENED TOTAL 114
SCREENINGS
736924
736931
SCREENINGS TOTAL 68
STONE, 1 1/2"
736715
STONE, 1 1/2" TOTAL 18
STONE, 3/4"
736714
740310
744761
STONE, 3/4" TOTAL 56
TRUCK MATERIALS TOTAL 1698
OVERALL TOTAL 3255.5

211 Records