BRADFORD-FERNALD POINT

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 210 EXCAVATOR
7/1/2026 GOTT,TIM 8 HRS 745869
7/2/2026 GOTT,TOM 6.5 HRS 745744
210 EXCAVATOR TOTAL 14.5
225 EXCAVATOR
7/1/2026 SAVAGE,BRIAN 2 HRS MOVED 745699
225 EXCAVATOR TOTAL 2
279 CAT TRACK LOADER
7/8/2026 KELLEY,DENNIS 1 HRS MOVED 746380
279 CAT TRACK LOADER TOTAL 1
BOBCAT, MINI
7/1/2026 CARTER,CAMERON 2 HRS MOVED 746043
7/2/2026 LITTLE,GARY 3 HRS 745926
BOBCAT, MINI TOTAL 5
WHEELER
7/1/2026 SAVAGE,BRIAN 4 HRS 746095
WHEELER TOTAL 4
EQUIPMENT TOTAL 26.5
LABOR REGULAR
6/30/2026 MILES,COOPER 2 HRS 745886
6/30/2026 GRAY,LINCOLN 3 HRS 746020
7/1/2026 GRAY,LINCOLN 8 HRS 746026
7/2/2026 LITTLE,GARY 4 HRS 745927
7/2/2026 GRAY,LINCOLN 6 HRS 746027
REGULAR TOTAL 23
LABOR TOTAL 23
MATERIALS PIPE, SCH 20 4"
6/30/2026 GRAY,LINCOLN 500 FT 746021
PIPE, SCH 20 4" TOTAL 500
PIPE, SCH 20-4" PERF
7/1/2026 GRAY,LINCOLN 100 FT 746100
PIPE, SCH 20-4" PERF TOTAL 100
SCH 20 45, 4"
6/30/2026 GRAY,LINCOLN 2 EA 746024
7/1/2026 GRAY,LINCOLN 3 EA 746025
SCH 20 45, 4" TOTAL 5
SCH 20 90, 4"
6/30/2026 GRAY,LINCOLN 0 EA 2 BOXES 746022
SCH 20 90, 4" TOTAL 0
STONE, 3/8" BLUE
6/16/2026 LYONS,GEORGE 6 YDS MACQUINN 745157
STONE, 3/8" BLUE TOTAL 6
TEE, SCH 20, 4"
6/30/2026 GRAY,LINCOLN 8 EA 746023
TEE, SCH 20, 4" TOTAL 8
MATERIALS TOTAL 619
OTHER FEES SUBCONTRACT
4/7/2026 GOTT,BETH 0 EA $150.00 MIKE DEWITT 746625
7/9/2026 GOTT,BETH 0 EA $36,000.00 JDS FOUNDATIONS 746631
7/11/2026 GOTT,BETH 0 EA $55,000.00 JDS FOUNDATIONS 746630
SUBCONTRACT TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS STONE, 3/4"
7/1/2026 SAVAGE,BRIAN 28 YDS BASS HARBOR STOCKPILE 745700
7/1/2026 EDWARDS,GUY 48 YDS BASS HARBOR STOCKPILE 745779
745805
CANCEL
STONE, 3/4" TOTAL 112
TRUCK MATERIALS TOTAL 112
OVERALL TOTAL 780.5

25 Records