MOUNT DESERT ISLAND HIGH SCHOOL

Back to JOBS IN PROGRESS
Exit Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 200 EXCAVATOR
727817
728054
200 EXCAVATOR TOTAL 7
75 EXCAVATOR
729240
729334
729242
729244
75 EXCAVATOR TOTAL 14
8 YD TRUCK
728098
8 YD TRUCK TOTAL 4
BOOMTRUCK
728671
729466
BOOMTRUCK TOTAL 4
ROLLER
741405
ROLLER TOTAL 1.5
TRIAXLE
729396
TRIAXLE TOTAL 1.5
WHEELER
729378
729350
WHEELER TOTAL 6.5
EQUIPMENT TOTAL 38.5
LABOR CEMENT
728180
728190
728204
728211
728184
728196
728208
728186
728201
728650
728666
728652
728667
728654
728668
728662
729435
729439
729450
729458
729440
729453
729814
729825
CEMENT TOTAL 125
REGULAR
727818
728400
729233
729241
729227
729243
729245
729351
REGULAR TOTAL 30.5
LABOR TOTAL 155.5
MATERIALS BOLTS
729454
BOLTS TOTAL 20
CATCH BASIN
736181
CATCH BASIN TOTAL 0
CONCRETE, 3000 PSI
728712
728655
729455
CONCRETE, 3000 PSI TOTAL 46.5
PIPE, SCH 35-8"
728198
PIPE, SCH 35-8" TOTAL 90
PIPE, SCH 40-6"
729872
PIPE, SCH 40-6" TOTAL 50
REBAR, #4
728197
728651
728653
729451
REBAR, #4 TOTAL 55
WIRE, FLOOR
729452
WIRE, FLOOR TOTAL 1
MATERIALS TOTAL 262.5
TRUCK MATERIALS GRAVEL
729318
GRAVEL TOTAL 36
GRAVEL, 1" MINUS CRUSHED
729379
729348
GRAVEL, 1" MINUS CRUSHED TOTAL 56
STONE, 3/4"
729349
STONE, 3/4" TOTAL 10
STONE, 3/4" BEIGE
728099
STONE, 3/4" BEIGE TOTAL 16
STONEDUST
734881
STONEDUST TOTAL 8
TRUCK MATERIALS TOTAL 126
OVERALL TOTAL 582.5

63 Records