GILLEY, CLAYTON

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 160 EXCAVATOR
6/30/2026 HOPKINS,FRANK 8 HRS 745992
160 EXCAVATOR TOTAL 8
200 EXCAVATOR
6/2/2026 GOTT,PETER 7 HRS 743945
6/2/2026 SAVAGE,BRIAN 2 HRS 744062
6/3/2026 GOTT,PETER 3 HRS 743946
6/3/2026 SAVAGE,BRIAN 2 HRS MOVED 744069
6/5/2026 SAVAGE,BRIAN 2 HRS MOVED 744070
6/5/2026 GOTT,TOM 6 HRS 744127
200 EXCAVATOR TOTAL 22
BOOMTRUCK
6/15/2026 KELLEY,DENNIS 2 HRS 745009
BOOMTRUCK TOTAL 2
PULPTRUCK
6/2/2026 EDWARDS,GUY 1 HRS 744146
6/3/2026 SAVAGE,BRIAN 2 HRS 744067
PULPTRUCK TOTAL 3
TRIAXLE
6/5/2026 KELLEY,DENNIS 1 HRS 744118
TRIAXLE TOTAL 1
EQUIPMENT TOTAL 36
LABOR CEMENT
6/4/2026 OVERLOCK,MIKE 4 HRS 744212
6/4/2026 LYONS,GEORGE 4 HRS 744228
6/5/2026 OVERLOCK,MIKE 8.5 HRS 744214
6/8/2026 LYONS,GEORGE 7 HRS 744699
6/8/2026 KEENE,BIDDY 7 HRS 744713
6/9/2026 LYONS,GEORGE 6 HRS 744702
6/9/2026 KEENE,BIDDY 3 HRS 744714
6/10/2026 LYONS,GEORGE 2.5 HRS 744703
6/15/2026 LYONS,GEORGE 2 HRS 745131
6/17/2026 LYONS,GEORGE 4 HRS 745133
6/17/2026 KEENE,BIDDY 1.5 HRS 745147
7/7/2026 OVERLOCK,MIKE 3 HRS 746491
7/7/2026 LYONS,GEORGE 3 HRS 746502
7/7/2026 KEENE,BIDDY 3 HRS 746515
CEMENT TOTAL 58.5
REGULAR
6/3/2026 MCALLISTER,JAMES 3 HRS 743880
6/5/2026 KELLEY,DENNIS 2 HRS 744117
REGULAR TOTAL 5
LABOR TOTAL 63.5
MATERIALS BOLTS
6/8/2026 LYONS,GEORGE 40 EA 744701
BOLTS TOTAL 40
CONCRETE, 3000 PSI
6/4/2026 LYONS,GEORGE 9 YDS $1,589.04 744233
6/8/2026 LYONS,GEORGE 16.5 YDS $2,791.47 744700
7/7/2026 LYONS,GEORGE 13.5 YDS $2,360.41 746503
CONCRETE, 3000 PSI TOTAL 39
DRAIN, FLOOR
6/17/2026 LYONS,GEORGE 1 EA 745135
DRAIN, FLOOR TOTAL 1
FILTER FABRIC
6/3/2026 MCALLISTER,JAMES 1625 SQFT 743883
FILTER FABRIC TOTAL 1625
PIPE, SCH 20-4" PERF
6/3/2026 MCALLISTER,JAMES 20 FT 743882
6/5/2026 OVERLOCK,MIKE 300 FT 744215
PIPE, SCH 20-4" PERF TOTAL 320
PIPE, SCH 35-4"
6/3/2026 MCALLISTER,JAMES 112 FT 743881
PIPE, SCH 35-4" TOTAL 112
PIPE, SCH 40-4"
6/30/2026 HOPKINS,FRANK 14 FT 745993
PIPE, SCH 40-4" TOTAL 14
POLY
6/17/2026 LYONS,GEORGE 1 SQFT 745134
POLY TOTAL 1
REBAR, #4
6/4/2026 LYONS,GEORGE 30 BARS 744232
REBAR, #4 TOTAL 30
SCH 20 22 1/2, 4"
6/5/2026 OVERLOCK,MIKE 1 EA 744219
SCH 20 22 1/2, 4" TOTAL 1
SCH 20 45, 4"
6/5/2026 OVERLOCK,MIKE 1 EA 744218
SCH 20 45, 4" TOTAL 1
SCH 20 90, 4"
6/5/2026 OVERLOCK,MIKE 9 EA 744216
SCH 20 90, 4" TOTAL 9
TAR
6/10/2026 LYONS,GEORGE 2 PAIL 744704
TAR TOTAL 2
TEE, SCH 20, 4"
6/5/2026 OVERLOCK,MIKE 4 EA 744217
TEE, SCH 20, 4" TOTAL 4
MATERIALS TOTAL 2199
OTHER FEES DISPOSAL FEES
6/2/2026 EDWARDS,GUY 0 TON 1 LD BRUSH TO MARSH 744147
6/3/2026 SAVAGE,BRIAN 0 TON 1 LD BRUSH 744068
DISPOSAL FEES TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL
6/30/2026 POND,HOWARD 18 YDS SMITH LOT 745713
6/30/2026 CROSSMAN,EVANS 18 YDS FELLIS PIT 745796
6/30/2026 CROSSMAN,EVANS 66 YARDS SMITH LOT 745797
GRAVEL TOTAL 102
STONE, 3/4"
6/2/2026 EDWARDS,GUY 28 YDS BASS HARBOR STOCKPILE 744150
6/3/2026 FERNALD,CECIL 8 YDS BASS HARBOR STOCKPILE 744138
6/5/2026 KELLEY,DENNIS 46 YDS BASS HARBOR STOCKPILE 744116
STONE, 3/4" TOTAL 82
TRUCK MATERIALS TOTAL 184
OVERALL TOTAL 2482.5

52 Records