GILLEY, CLAYTON

Back to JOBS IN PROGRESS
Exit Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 160 EXCAVATOR
745992
160 EXCAVATOR TOTAL 8
200 EXCAVATOR
743945
744062
743946
744069
744070
744127
200 EXCAVATOR TOTAL 22
BOOMTRUCK
745009
BOOMTRUCK TOTAL 2
PULPTRUCK
744146
744067
PULPTRUCK TOTAL 3
TRIAXLE
744118
TRIAXLE TOTAL 1
EQUIPMENT TOTAL 36
LABOR CEMENT
744212
744228
744214
744699
744713
744702
744714
744703
745131
745133
745147
746491
746502
746515
CEMENT TOTAL 58.5
REGULAR
743880
744117
REGULAR TOTAL 5
LABOR TOTAL 63.5
MATERIALS BOLTS
744701
BOLTS TOTAL 40
CONCRETE, 3000 PSI
744233
744700
746503
CONCRETE, 3000 PSI TOTAL 39
DRAIN, FLOOR
745135
DRAIN, FLOOR TOTAL 1
FILTER FABRIC
743883
FILTER FABRIC TOTAL 1625
PIPE, SCH 20-4" PERF
743882
744215
PIPE, SCH 20-4" PERF TOTAL 320
PIPE, SCH 35-4"
743881
PIPE, SCH 35-4" TOTAL 112
PIPE, SCH 40-4"
745993
PIPE, SCH 40-4" TOTAL 14
POLY
745134
POLY TOTAL 1
REBAR, #4
744232
REBAR, #4 TOTAL 30
SCH 20 22 1/2, 4"
744219
SCH 20 22 1/2, 4" TOTAL 1
SCH 20 45, 4"
744218
SCH 20 45, 4" TOTAL 1
SCH 20 90, 4"
744216
SCH 20 90, 4" TOTAL 9
TAR
744704
TAR TOTAL 2
TEE, SCH 20, 4"
744217
TEE, SCH 20, 4" TOTAL 4
MATERIALS TOTAL 2199
OTHER FEES DISPOSAL FEES
744147
744068
DISPOSAL FEES TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL
745713
745796
745797
GRAVEL TOTAL 102
STONE, 3/4"
744150
744138
744116
STONE, 3/4" TOTAL 82
TRUCK MATERIALS TOTAL 184
OVERALL TOTAL 2482.5

52 Records