ASTLE, MIKE

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
CEMENT
2/10/2026 LYONS,GEORGE 2 738682
CEMENT TOTAL 2
TOTAL 2
EQUIPMENT 160 EXCAVATOR
1/20/2026 PAINE,GARY 5 HRS 737781
1/20/2026 SAVAGE,BRIAN 2.5 HRS MOVED 737818
1/21/2026 PAINE,GARY 7 HRS 737783
1/22/2026 PAINE,GARY 8 HRS 737785
1/23/2026 PAINE,GARY 5.5 HRS 737787
1/26/2026 PAINE,GARY 1.5 HRS 738021
1/27/2026 PAINE,GARY 3 HRS 738026
160 EXCAVATOR TOTAL 32.5
75 EXCAVATOR
2/13/2025 EISWORTH,GEORGE 4 HRS 738503
2/6/2026 COUSINS,BOB 1 HRS MOVED 738381
2/12/2026 EISWORTH,GEORGE 8.5 HRS 738502
75 EXCAVATOR TOTAL 13.5
BOOMTRUCK
1/28/2026 GOTT,TOM 3.5 HRS 738118
2/5/2026 GOTT,TOM 4 HRS PICKED UP PANELS 738245
BOOMTRUCK TOTAL 7.5
ONE TON
2/6/2026 PINKHAM,DONALD 2.5 HRS 738204
ONE TON TOTAL 2.5
PULPTRUCK
1/21/2026 CHISHOLM,NATE 6 HRS 737902
PULPTRUCK TOTAL 6
PUMP TRUCK
2/2/2026 LYONS,GEORGE 0 HRS $1,050.00 738403
PUMP TRUCK TOTAL 0
TRIAXLE
1/21/2026 PRATT,RICHARD 8.5 HRS 737802
1/21/2026 BAS,RONNIE 8.5 HRS 737811
1/22/2026 PRATT,RICHARD 7.5 HRS 737804
1/22/2026 BAS,RONNIE 7 HRS 737813
1/23/2026 PRATT,RICHARD 4.5 HRS 737808
TRIAXLE TOTAL 36
WHEELER
1/23/2026 KELLEY,DENNIS 4 HRS 737847
WHEELER TOTAL 4
EQUIPMENT TOTAL 102
LABOR CEMENT
2/4/2025 KEENE,BIDDY 5.5 HRS 738420
1/20/2026 LYONS,GEORGE 8.5 HRS 737930
1/21/2026 LYONS,GEORGE 10 HRS 737931
1/22/2026 LYONS,GEORGE 10 HRS 737934
1/23/2026 CHEN,ZACHARY 9.5 HRS 737778
1/23/2026 OVERLOCK,MIKE 10.5 HRS 737922
1/23/2026 LYONS,GEORGE 10.5 HRS 737935
1/26/2026 OVERLOCK,MIKE 6.5 HRS 738139
1/27/2026 OVERLOCK,MIKE 9 HRS 738140
1/27/2026 LYONS,GEORGE 9 HRS 738144
1/28/2026 CHEN,ZACHARY 9 HRS 738064
1/28/2026 OVERLOCK,MIKE 8.5 HRS 738141
1/28/2026 LYONS,GEORGE 8.5 HRS 738145
1/29/2026 CHEN,ZACHARY 9 HRS 738065
1/29/2026 OVERLOCK,MIKE 8.5 HRS 738142
1/30/2026 OVERLOCK,MIKE 8 HRS 738143
1/30/2026 LYONS,GEORGE 8 HRS 738147
2/2/2026 OVERLOCK,MIKE 6 HRS 738394
2/2/2026 LYONS,GEORGE 6 HRS 738402
2/2/2026 KELLEY,DENNIS 3.5 HRS 738419
2/4/2026 OVERLOCK,MIKE 8.5 HRS 738395
2/4/2026 LYONS,GEORGE 8.5 HRS 738408
2/5/2026 OVERLOCK,MIKE 8 HRS 738396
2/5/2026 LYONS,GEORGE 8 HRS 738409
2/6/2026 OVERLOCK,MIKE 3.5 HRS 738398
2/6/2026 LYONS,GEORGE 3.5 HRS 738413
2/10/2026 OVERLOCK,MIKE 2 HRS 738677
2/16/2026 OVERLOCK,MIKE 6.5 HRS 739014
2/16/2026 LYONS,GEORGE 6.5 HRS 739021
2/20/2026 OVERLOCK,MIKE 3.5 HRS 739019
CEMENT TOTAL 222.5
PLOWING AND SANDING
1/20/2026 MCALLISTER,JAMES 0 HRS 737780
2/12/2026 MCALLISTER,JAMES 0 HRS 738473
PLOWING AND SANDING TOTAL 0
REGULAR
1/20/2026 PAINE,GARY 4 HRS 737782
1/20/2026 EVANGELISTA,JOEY 8.75 HRS 737789
1/21/2026 PAINE,GARY 2 HRS 737784
1/22/2026 PAINE,GARY 2 HRS 737786
1/23/2026 PAINE,GARY 4 HRS 737788
1/23/2026 EVANGELISTA,JOEY 3.5 HRS 737790
1/26/2026 PAINE,GARY 5 HRS 738022
1/26/2026 EVANGELISTA,JOEY 6.5 HRS 738061
1/27/2026 PAINE,GARY 5.5 HRS 738027
2/12/2026 CHEN,ZACHARY 8 HRS 738504
2/13/2026 PINKHAM,DONALD 7.5 HRS 738451
2/14/2026 PINKHAM,DONALD 4 HRS 738452
REGULAR TOTAL 60.75
LABOR TOTAL 283.25
MATERIALS BOLTS
2/2/2026 LYONS,GEORGE 27 EA 738407
BOLTS TOTAL 27
CALCIUM
1/21/2025 LYONS,GEORGE 2 BAGS 737933
1/23/2026 LYONS,GEORGE 3 BAGS 737937
1/26/2026 PAINE,GARY 2 BAGS 738173
2/2/2026 LYONS,GEORGE 5 BAGS 738404
CALCIUM TOTAL 12
CONCRETE, 3000 PSI
1/23/2026 LYONS,GEORGE 19 YDS $3,211.21 737936
2/2/2026 LYONS,GEORGE 27 YDS $4,563.30 738405
2/16/2026 LYONS,GEORGE 16 YDS $2,822.34 739022
CONCRETE, 3000 PSI TOTAL 62
DRAIN, FLOOR
2/5/2026 LYONS,GEORGE 1 EA 738411
DRAIN, FLOOR TOTAL 1
PIPE, SCH 20-4" PERF
1/26/2026 PAINE,GARY 140 FT 738023
1/27/2026 PAINE,GARY 120 FT 738028
PIPE, SCH 20-4" PERF TOTAL 260
PIPE, SCH 35-4"
1/27/2026 PAINE,GARY 20 FT 738031
PIPE, SCH 35-4" TOTAL 20
POLY
1/20/2026 GOTT,BETH 0 SQFT $227.77 2 ROLLS 20' 6MIL CLR POLY 100LF/RL HVY 738745
1/21/2026 LYONS,GEORGE 0 SQFT 1 ROLL 737932
2/6/2026 LYONS,GEORGE 0 SQFT 1 ROLL 738414
POLY TOTAL 0
REBAR, #4
1/23/2026 LYONS,GEORGE 15 BARS 737938
1/28/2026 LYONS,GEORGE 42 BARS 738146
2/2/2026 LYONS,GEORGE 4 BARS 738406
REBAR, #4 TOTAL 61
SCH 20 45, 4"
1/27/2026 PAINE,GARY 2 EA 738030
SCH 20 45, 4" TOTAL 2
SCH 20 90, 4"
1/26/2026 PAINE,GARY 6 EA 738024
1/27/2026 PAINE,GARY 5 EA 738029
SCH 20 90, 4" TOTAL 11
TAR
2/5/2026 LYONS,GEORGE 2 PAIL 738410
TAR TOTAL 2
TEE, SCH 20, 4"
1/26/2026 PAINE,GARY 2 EA 738025
TEE, SCH 20, 4" TOTAL 2
WIRE, FLOOR
2/6/2026 LYONS,GEORGE 2 ROLLS 738416
WIRE, FLOOR TOTAL 2
MATERIALS TOTAL 462
OTHER FEES DISPOSAL FEES
1/21/2026 CHISHOLM,NATE 0 TON 1 LD BRUSH/1 LD STUMPS 737903
DISPOSAL FEES TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL
12/4/2025 HAVEY,DICK 28 YDS FELLIS PIT 735839
2/12/2026 CROSSMAN,EVANS 36 YDS FELLIS PIT 738642
2/12/2026 RINGS,PAVING 42 YDS FELLIS PIT 739468
2/13/2026 RINGS,PAVING 14 YDS FELLIS PIT 739470
GRAVEL TOTAL 120
LEDGE, 3"
1/23/2026 PRATT,RICHARD 54 YDS MARSH 737807
1/23/2026 KELLEY,DENNIS 14 YDS MARSH 737846
LEDGE, 3" TOTAL 68
STONE, 3/4"
1/22/2026 BAS,RONNIE 18 YDS BASS HARBOR STOCKPILE 737814
1/27/2026 EDWARDS,GUY 32 YDS BASS HARBOR STOCKPILE 738122
1/27/2026 RINGS,PAVING 28 YDS BASS HARBOR STOCKPILE 738192
2/5/2026 FERNALD,CECIL 7 YDS BASS HARBOR STOCKPILE 738347
2/6/2026 PINKHAM,DONALD 3 YDS BASS HARBOR STOCKPILE 738205
2/6/2026 LYONS,GEORGE 3 YDS BASS HARBOR STOCKPILE 738415
STONE, 3/4" TOTAL 91
STONE, 3/4" BEIGE
6/2/2026 HAVEY,DICK 12 YDS BASS HARBOR STOCKPILE MIKE'S HOUSE 744245
STONE, 3/4" BEIGE TOTAL 12
TRUCK MATERIALS TOTAL 291
OVERALL TOTAL 1140.25

104 Records